Bessie St, East Blvd, 8th & 9th Aves. Construction Week of April 13th to April 17th
Crews will be performing miscellaneous activities at various locations, which may include road grading, right-of-way grading, and pouring concrete at structures located at 8th and Magnolia St. and 8th and East Blvd. Here’s what to expect from Monday (4/13) to Friday (4/17):
Forming and pouring concrete at structures at 8th Ave and Magnolia Street and 8th Ave and East Blvd.
Possible road grading, road shoulder grading.
There may be some temporary daytime lane closures.
Please allow extra travel time and drive safely! Thank you for your patience!

Construction Update for 3rd Ave. and Magnolia Street - Week of April 13th to April 17th
Crews will be installing storm drainage along 3rd Street and pouring the concrete weir at its end. Here’s what to expect from Monday (4/13) to Friday (4/17):
Completion of storm pipe after water service relocation.
Possibly grading swales this week.
** 3rd Avenue may have daytime closures on some days this week. **
There may be travel delays in this area. Please allow extra travel time and drive safely! Thank you for being so patient!

Butler St & 7th Ave Construction - Week of April 13th to April 17th
This week, a crew may be doing limited work in Fernwood Park and possibly working in various areas along Butler and Forest Streets and 7th Ave. Here’s what to expect from Monday (4/13) to Friday (4/17):
A crew may be grading a swale in Fernwood Park.
A crew may continue work along Butler and Forest Streets and 7th Ave, working on swales and road shoulders.
There may be daytime lane closures on Butler Street between 6th and 7th Avenues and on 7th Ave between Forest and Butler Streets.
Please allow extra travel time and drive safely! Thank you for being so patient!

West 2nd Avenue Construction Week of April 13th to April 17th
The information below is for West of Pine Street
Please be sure to allow for extra travel time!
Crews will continue repairing concrete and paver driveways and grading dirt behind the curb where needed. Sodding, mulching, or installing gravel. Here’s what to expect from Monday (4/13) to Friday (4/17):
Tie-in paver and concrete driveways to the new curb where needed.
Backfill and grade behind curbs in the right-of-way.
Install Gravel, Sod, or Mulch.
***IMPORTANT***
Speed Humps will be reinstalled in the same locations as before. There will be lane closures on the day this work occurs. The Speed Hump work could occur this week or next week.
Daytime closures will be in effect. Please drive carefully! Thank you for your continued patience!

Lakes Cleanup Day – Round 2
Sunday, April 19, 2026 | 1:30 – 3:30 PM
Help us keep Windermere’s lakes pristine!
After our first Lakes Cleanup Day on November 2, here’s your chance to join us for Round 2!
Meeting Location: Fernwood Park, 632 Butler Street
Time: 1:15 PM (to gather supplies and organize teams)
What to Bring: Closed-toed shoes; be prepared to walk through neighborhoods collecting trash to prevent litter from entering our lakes.
This is a great activity for the whole family—minors must be accompanied by an adult.
To register: Use the link or QR code on our website and social media.
For more information, contact Peter Balgobin.
#CleanLakes #LakesCleaupDay #Windermere #Stormwater #NPDES

💛 Windermere Legacy Fund & Second Harvest Food Bank 💛
As part of our first community initiative, the Windermere Legacy Fund is partnering with Second Harvest Food Bank for a meaningful food drive and fundraiser during Food Truck Night on April 24, 2026.
While we gather as a community, we also have the opportunity to support neighbors facing challenges due to rising costs and inflation.
🌟 Ways You Can Help:
🥫 Bring Donations: Stop by the Second Harvest tent at Town Square Park and drop off non-perishable food items.
🏛️ Drop Off at Town Administration Building: Can’t attend? Donation bins will be available in the Town Administration Building lobby.
💻 Give Online: Support the cause here https://give.feedhopenow.org/windermerelegacy2026
✨ Make Your Impact Go Further
All monetary donations will be matched dollar-for-dollar, up to $2,500!
Every $10 provides up to 40 meals for those in need.
Together, our Town can make a real difference. Join us for our Giving Back Campaign!
— Windermere Legacy Board

West 2nd Avenue Construction Week of April 06th to April 10th
The information below is for West of Pine Street
Please be sure to allow for extra travel time!
Crews will repair concrete and paver driveways and grade dirt behind the curb where needed. Sodding, mulching, or installing gravel. Here’s what to expect from Monday (4/06) to Friday (4/10):
Tie-in paver and concrete driveways to the new curb where needed.
Backfill and grade behind curbs in the right-of-way.
Install Gravel, Sod, or Mulch.
***IMPORTANT***
Speed Humps will be reinstalled in the same locations they were before. There will be lane closures on the day this work occurs. The Speed Hump work could occur this week or next week.
Daytime closures will be in effect. Please drive carefully! Thank you for your continued patience!

Construction Update for 3rd Ave. and Magnolia Street - Week of April 06th to April 10th
Crews will be installing storm drainage alongside 3rd Street. Here’s what to expect from Monday (4/06) to Friday (4/10):
Forming and pouring a concrete weir in the retention area.
Orange County Water will relocate a service line on 4/09th.
Completion of storm pipe after water service relocation.
** 3rd Avenue may have daytime closures on some days this week. **
There may be travel delays in this area. Please allow extra travel time and drive safely! Thank you for being so patient!

Bessie St, East Blvd, 8th & 9th Aves. Construction Week of April 06th to April 10th
Crews will be performing miscellaneous activities at various locations, which may include road grading, right-of-way grading, sodding, and some concrete work. Here’s what to expect from Monday (4/06) to Friday (4/10):
Concrete weirs and mitered ends will be formed and poured along East Blvd. and 8th Street.
Possible road grading, road shoulder grading.
Sod will be installed behind the curb on the 8th & Bessie curve.
There may be some temporary daytime lane closures.
There may be travel delays in this area. Please allow extra travel time and drive safely! Thank you for your patience!

Butler St & 7th Ave Construction - Week of April 6th to April 10th
This week, a crew may be doing limited work in Fernwood Park and possibly working in various areas along Butler and Forest Streets and 7th Ave. Here’s what to expect from Monday (4/06) to Friday (4/10):
A crew may be grading a swale in Fernwood Park.
A crew may continue work along Butler and Forest Streets and
7th Ave, working on swales and road shoulders.
There may be daytime lane closures on Butler Str. between 6th and 7th Avenues, and on 7th Ave. between Forest and Butler Streets.
Please allow extra travel time and drive safely! Thank you for being so patient!

Orange County
ROAD CLOSURE NOTICE
Date: April 7, 2026 / Time: 8:30 AM – 4:00 PM
Location: 720 Main Street, Windermere
Work Description: Installation of a shortline water service (maintenance/street restoration).
Traffic Impact:
- Temporary road closure in the work area
- Barricades and detour signage will be in place
Resident Access: Access to residences will be maintained at all times
Public Impact: May affect general traffic in the area
Contacts:
Phillip Bates: 321-247-2257
Luis Ruiz: 407-717-5586
Field Support Center: 407-836-6818

Lakes Cleanup Day – Round 2
Sunday, April 19, 2026 | 1:30 – 3:30 PM
Help us keep Windermere’s lakes pristine!
After our first Lakes Cleanup Day on November 2, here’s your chance to join us for Round 2!
Meeting Location: Fernwood Park, 632 Butler Street
Time: 1:15 PM (to gather supplies and organize teams)
What to Bring: Closed-toed shoes; be prepared to walk through neighborhoods collecting trash to prevent litter from entering our lakes.
This is a great activity for the whole family—minors must be accompanied by an adult.
To register: Use the link or QR code on our website and social media.
For more information, contact Peter Balgobin.
#CleanLakes #LakesCleaupDay #Windermere #Stormwater #NPDES

February: “Pet Waste Pollutes”
Pet waste left on the ground washes into storm drains and adds harmful bacteria to our lakes.
Always pick up after your pets!
For more information, visit our Stormwater Page: https://www.town.windermere.fl.us/page/stormwater
#CleanWaterStartsWithYou #NPDES

SPECIAL TOWN COUNCIL MEETING / ATTORNEY-CLIENT SESSION NOTICE
There will be special meeting of the Town Council during which an attorney-client session will be held in accordance with Section 286.011(8), Florida Statutes, with Mayor Loren “Andy” Williams, Council Members Catherine “CT” Allen, Mandy David, Tony Davit, Brandi Haines, and Tom Stroup, Town Manager Robert Smith, Town Attorneys Rachael Crews, Heather Ramos, Bud Beddington, Glennys Ortega Rubin, and Julissa Rodriguez on April 6, at 6:00 pm, in Town Hall located at 520 Main Street, Windermere, FL 34786.
The purpose of the attorney-client session is to allow the Town Attorneys to seek advice from the Town Council which will be confined to settlement negotiations and strategy related to litigation expenditures regarding the pending lawsuits of Town of Windermere v. Fanelli, Daniel et al., (Court Case #: 2022-CA-006509-O) and Town of Windermere v. Fanelli, Daniel et al., (Court Case #: 6D2025-2962).
#66668639 v1

“Car Washing Tips”
Wash your car on grass or at a commercial car wash that treats the water, not in your driveway.
Soapy water carries pollutants into storm drains. For more information, visit our Stormwater Page: https://www.town.windermere.fl.us/page/stormwater
#NPDES #StormwaterTips

Lakes Cleanup Day – Round 2
Sunday, April 19, 2026 | 1:30 – 3:30 PM
Help us keep Windermere’s lakes pristine!
After our first Lakes Cleanup Day on November 2, here’s your chance to join us for Round 2!
Meeting Location: Fernwood Park, 632 Butler Street
Time: 1:15 PM (to gather supplies and organize teams)
What to Bring: Closed-toed shoes; be prepared to walk through neighborhoods collecting trash to prevent litter from entering our lakes.
This is a great activity for the whole family—minors must be accompanied by an adult.
To register: Use the link or QR code on our website and social media.
For more information, contact Peter Balgobin.
#CleanLakes #LakesCleaupDay #Windermere #Stormwater #NPDES

🐰 Join us for the Annual Easter Egg Hunt Extravaganza hosted by the Windermere Police Foundation!
📅 Saturday, April 4th
⏰ 10:00 AM – 12:00 PM
📍 Town Square Park
Bring the whole family for a morning full of fun, treats, and unforgettable memories! Enjoy a festive parade, take photos with the Easter Bunny, and hunt for eggs by age group:
🥚 Ages 0–3
🥚 Ages 4–6
🥚 Ages 7–9
✨ Find a Golden Ticket and win a bike!

West 2nd Avenue Construction Week of March 30th to April 3rd
The information below is for West of Pine Street
Please be sure to allow for extra travel time!
Crews will be repairing concrete and paver driveways and grading dirt behind the curb where needed. Sodding, mulching, or installing gravel. Tuesday and Wednesday are paving days. Here’s what to expect from Monday (3/30) to Friday (4/03):
Tie-in paver and concrete driveways to the new curb where needed.
Backfill and grade behind curbs in the right-of-way.
***IMPORTANT***
Paving is scheduled for March 31st & April 1st. On Tuesday, March 31st, there will be a full road closure from 801 W. 2nd Ave to the cul-de-sac from 8:00 am 6 pm. No vehicles will be able to come or go during this time.
If there is a delay due to inclement weather, paving will resume the following day on the same 2-day schedule.
Please pay attention to specific paving notices and read the details related to the paving dates.
Daytime closures will be in effect. Please drive carefully! Thank you for your continued patience!

Butler St & 7th Ave Construction - Week of March 30th to April 03rd
This week, a crew may be doing limited work in Fernwood Park and possibly working in various areas along Butler and Forest Streets and 7th Ave. Here’s what to expect from Monday (3/30) to Friday (4/03):
A crew may be grading a swale in Fernwood Park.
A crew may continue work along Butler and Forest Streets and
7th Ave, working on swales and road shoulders.
There may be daytime lane closures on Butler Street between 6th and 7th Avenues and on 7th Ave between Forest and Butler Streets.
Please allow extra travel time and drive safely! Thank you for being so patient!

Construction Update for 3rd Ave. and Magnolia Street - Week of March 30th to April 3rd
Crews will be installing storm drainage alongside 3rd Street. Here’s what to expect from Monday (3/30) to Friday (4/03):
Forming and pouring a concrete weir in the retention area.
Orange County Water will hopefully relocate a service line.
Completion of storm pipe after water service relocation.
** 3rd Avenue may have daytime closures on some days this week. **
There may be travel delays in this area. Please allow extra travel time and drive safely! Thank you for being so patient!