
We are loving our new app! Access documents, news updates, and even emergency notifications, right from your pocket.
Download for Android https://aptg.co/818TFN
Download for iPhone https://aptg.co/F6c7-B


Traffic Alert: Monday (6/9) through Friday (6/13)
- Installation of storm structures and concrete pipe from Forest to Butler.
- Road closure Forest to Butler. Detour will be in place.
- Installation of water line between 611-711 W. 2nd Ave.
- One lane closure with a flagger.
- Pressure testing at intersections between Main and Pine.
Temporary daytime closures remain in effect. Please allow extra travel time and drive safely.
Thank you for your continued support!


Congratulations!


Attention Residents!
West 2nd Ave. Construction Update :
Tuesday (6/3) through Friday (6/6):
- Pressure testing at all intersections between Main and Pine.
- Water main installed from 611 to 711 W. 2nd Ave.
🚧 Temporary daytime closures remain in effect. Allow extra travel time!


We need you at our Annual 4th July Pancake Breakfast
Friday, July 4th @ Town Hall
Contact Ms. Lilian Colli - LColli@town.windermere.fl.us


Attention Residents!
West 2nd Ave. Construction Update :
Monday (6/2) – Demo of Asphalt from 611 to 711 W. 2nd Ave.
Tuesday (6/3) – Gas Main Work at Butler Road closure from Forest to Palm
Tuesday (6/3) through Friday (6/6):
- Pressure testing at all intersections between Main and Pine.
- Water main installed from 611 to 711 W. 2nd Ave.
🚧 Temporary daytime closures remain in effect. Allow extra travel time!


For more information call Orange County Utilities - Field Services Division (407) 836-6821


Congratulations to our Assistant Town Manager and Director of Public Works, Tonya Elliott Moore, on earning her Master's Degree in Public Administration!
This accomplishment is a testament to her hard work, dedication, and passion for making a positive impact in the public sector.
We are proud to have her on our team!
#TownPride #Congratulations #MPA


Request Inspection - https://form.jotform.com/250154421541041
#WindermereLegacyTree #TreeBoard #GreenerWindermere #LegacyTreePlaque #WindermereFL


#TownOfWindermere #ParkAccess #LakeStreetPark #LakeDownPark #WindermereParks


Public Works Updates


Dirt Road Repairs Underway


We're thrilled to announce the new app for Town Of Windermere! It's everything Town Of Windermere, in your pocket.
Download for Android https://aptg.co/818TFN
Download for iPhone https://aptg.co/F6c7-B


Road Closures: West 2nd Avenue Construction - Week of May 26th


We have completed the project's final steps at the 4th and 5th Ave entrance.
The Flexi Pave material will need until Monday, May 26th to cure and dry!


TOMORROW: Last Food Truck Night Before Summer Break!
Join us for our final Food Truck Night of the season! For more information, visit: https://town.windermere.fl.us/event/food-truck-night-19-4/

Road Closures: West 2nd Avenue Update - Midweek Progress


Road Closures: West 2nd Avenue Construction - Week of May 19th


Attention Residents!


Public Works Maintenance Worker
Salary Range: Min $16.00 – Max $25.01 / Hours are Monday - Friday, 7am - 4pm.
The Town of Windermere seeks qualified applicants to join our Public Works team. The ideal candidate would have experience in performing routine and preventative maintenance and repair procedures and repair procedures on Town buildings, mechanical equipment, stormwater systems, streets, and parks.
Please send your resume to pbalgobin@town.windermere.fl.us
For more information go to the website: https://town.windermere.fl.us/employment-opportunities/
