Town Square Park Restroom Concepts Available for Viewing

Town residents are invited to stop by the Town Administration Lobby (614 Main Street, Building 100) to explore two conceptual design options for potential public restrooms in the Town Square Park area.
The display features Option 1 and Option 2, which are currently under review as part of the Town’s ongoing park planning efforts.
Residents are encouraged to view the concepts during regular office hours and share any informal thoughts or feedback with Peter Balgobin: PBalgobin@Town.Windermere.FL.US.
We appreciate your interest and involvement as we continue planning thoughtful improvements in the heart of Town Square.

Thank you for being an engaged and cooperative part of our community.

NOTE: You can see the options on the meeting agenda!

5 months ago, Town of Windermere
Public Works

Attention Residents!

We’ve posted updates about the Town’s 2026 Municipal Election. To learn more, please visit the links below:

5 months ago, Town of Windermere
election

ATTENTION: All Residents of West 2nd Avenue and Pine Street!
Precautionary Boil Water Advisory - Tuesday, January 13, 2026

Planned interruption in water service will occur on Tuesday, 01/13th from 7 AM to 7 PM, due to necessary work in your area. As a precaution, please boil all water used for drinking, cooking, making ice, brushing teeth, or washing dishes prior to use. Heating water to a rolling boil for at least one (1) minute is recommended.
The water is safe for bathing, laundering, and other non-consumptive uses.
This “Precautionary Boil Water Advisory” will remain in effect until the work has been completed and bacteriological testing shows that water is safe to drink: Customers will be notified!

Further Information call Orange County Utilities Water Division at (407) 254-9850 / (407) 836-2777

https://5il.co/3tb3g

5 months ago, Town of Windermere
Orange County Utilities

ATTENTION
Tuesday, January 13th
Town Council Meeting
**CANCELED**

Information about upcoming meetings can be found on the website:
https://www.town.windermere.fl.us/page/meeting-agendas-minutes

6 months ago, Town of Windermere
meeting

ATTENTION RESIDENTS: Playgrounds Mulch Installation!

Please be advised that ALL playground areas will be temporarily closed on Wednesday, January 14th, and Thursday, January 15th, while crews complete scheduled mulch installation and surface maintenance.

The playgrounds are expected to reopen on Friday, January 16th, following completion of the work.

This temporary closure will allow staff to safely complete the maintenance and ensure the play areas are ready for public use. We appreciate your patience and understanding during this brief closure.

Thank you for being so cooperative.

6 months ago, Town of Windermere
Public Works

Tonight's Town Council Workshop is a
VIRTUAL PUBLIC INFORMATION WORKSHOP

It will be only a virtual meeting - not at Town Hall!

January 6, 2026 6:00 PM

Join Zoom Meeting: www.ZOOM.com

Meeting ID: 863 417 2453
Passcode: TOW2024

One tap mobile: +1(305)224-1968,,8634172453# US

Agenda HERE.

6 months ago, Town of Windermere
meeting
Butler St & 7th Ave Construction
Week of Jan. 5th – Jan. 9th.

Please be sure to allow for extra travel time and Drive Safely.

Crews will be pouring curbs along Butler Street and
Installing storm drainage in Fernwood Park.
Here’s what to expect:


• Monday (1/5)

- Pour Curbs

• Tuesday (1/6)- Friday (1/9)

- Clean up.

This week the Boat Ramp will be accessible be from either 7th Ave or Butler, although 7th will be most dependable. There could be temporary closures on Butler Street.

Temporary daytime closures will be in effect. Please allow extra travel time and drive safely.

Thank you for your patience!

6 months ago, Town of Windermere
Butler & 7th week of Jan 5th
Bessie St, East Blvd, 8th & 9th Aves. Construction
Week of Jan 5th – Jan 9th.

Please be sure to allow for extra travel time and Drive Safely.

Crews will installing storm drainage.
Here’s what to expect:

• Tuesday (1/6) - Friday (1/9)

- Installation of Storm Drainage on 9th Ave from Lake Bessie.

- Clean up lay down yard.

Temporary daytime road closures along East Blvd are possible this week. Please allow extra travel time and drive safely.

Thank you for your patience!
6 months ago, Town of Windermere
Bessie, 8th & 9th week of Jan 5th.
*** CANCELED *** HISTORIC PRESERVATION BOARD

January 5, 2026 5:00 PM - 6:30 PM
**CANCELED** PD / Community Conference Room
Urgent Notice: This meeting has been CANCELED.
Let us know if you have any questions.
6 months ago, Town of Windermere
HPB Meeting Canceled
****WEST 2nd AVENUE CONSTRUCTION****
WEEK OF JANUARY 5th - 9th
(The information below is for West of Pine Street)

Please be sure to allow for extra travel time and Drive Safely.

Crews will be installing lime rock for curbs and making paver and concrete driveway repairs.
Here's what to expect:

MONDAY, JANUARY 5th - FRIDAY, JANUARY 9th
- Installation of lime rock in preparation for curb on South side of street.
- Tie-in paver and concrete driveways to new curb

**TEMPORARY DAY TIME CLOSURES WILL BE IN EFFECT**

Thank you for your continued patience.
6 months ago, Danyel Hylton
WEST 2nd AVENUE CONSTRUCTION WEEK OF JANUARY 5th - 9th

“Storm Drains Are Not Trash Cans”
Did you know that anything entering a storm drain goes directly to our lakes, untreated?
Never dump oil, paint, yard waste, or debris into storm drains.
Keep Windermere’s waters clean!

6 months ago, Town of Windermere
stormwater

West 2nd Avenue Construction - Week of Dec. 29th to Jan. 2nd.
The information below is for West of Pine Street

Crews will be installing lime rock for curbs and installing storm structures. Here’s what to expect:

• Monday (12/29) - Wednesday (12/31): Installation of lime rock in preparation for curb on the South side of the street.

• Monday (12/29) – Tuesday (12/30): Installation of storm drainage in various locations from 613 to 802 W. 2nd Ave.

• Wednesday (12/31): Half Day. Clean up.

• Thursday (1/1) - Friday (1/2): Happy New Year!!

Temporary daytime closures will be in effect. Please allow for extra travel time and Drive Safely. Thank you for your continued patience!


6 months ago, Town of Windermere
Road Closures

🚨 WINDERMERE RESIDENTS ONLY 🚨
🌳 Annual Arbor Day Tree Giveaway
Help grow and protect Windermere’s tree canopy by planting the right tree in the right place 🌱
📍 NEW LOCATION: Windermere Recreation Center
🗓 Saturday, January 17
🕘 9:00 AM – 12:00 PM
🌳 First come, first served • While supplies last
✔️ One free tree per address
✔️ Proof of Windermere residency required
✔️ Second tree available after 11:15 AM, if available
🌿 Learn more about the tree species being offered and how to choose the right one for your property:
👉 https://www.town.windermere.fl.us/o/tow/page/windermere-treebute
Let’s grow Windermere—one tree at a time 💚
#WindermereFL #ArborDay #TreeGiveaway #UrbanForest #RightTreeRightPlace 🌳

6 months ago, Town of Windermere
Resident Tree Giveaway Social and App post

Bessie St, East Blvd, 8th & 9th Aves. Construction - Week of Dec. 22nd – Dec. 26th.

Crews will be removing some pine trees per plan and installing storm drainage. Here’s what to expect:

• Monday (12/22) - Tuesday (12/23)
- Removal of pine trees along East Blvd near Bessie boat ramp.
- Installation of Storm Drainage.
- Clean up.
• Wednesday (12/24) - Thursday (12/25)
- Happy Holidays!!

Temporary daytime road closures along East Blvd are possible this week. Please allow extra travel time and drive safely. Thank you for your patience!

6 months ago, Town of Windermere
Road Closures

Butler St & 7th Ave Construction - Week of Dec. 22nd – Dec. 26th.

Crews will be pouring curbs along Butler Street and Installing storm drainage in Fernwood Park. Here’s what to expect:

• Monday (12/22)
- Storm Drainage installation at Fernwood Park
- Installation of curb on the East side of Butler Street.
• Tuesday (12/23)
- Half Day. Clean up.
• Wednesday (12/24) – Friday (12/26)
- Happy Holidays!!

This week, the Boat Ramp will be accessible from either 7th Avenue or Butler, although 7th Avenue will be the most dependable option. There could be temporary closures on Butler Street.

Temporary daytime closures will be in effect. Please allow extra travel time and drive safely. Thank you for your patience!

6 months ago, Town of Windermere
Road Closures

West 2nd Avenue Construction - Week of Dec. 22nd – Dec. 25th.
(The information below is for West of Pine Street)

Crews will be installing storm drainage, lime rock for curbs, and pouring concrete curbs on the north side of West 2nd Ave. Here’s what to expect:

• Monday (12/22)
Installation of a new concrete curb on the north side of 2nd Ave.
• Tuesday (12/23)
Installation of lime rock in preparation for the curb on the South side of the street.
• Monday (12/22) – Tuesday (12/23)
Installation of storm drainage in various locations from 613 to 802 W. 2nd Ave.
• Wednesday (12/24)
Half Day. Clean up.
• Thursday (12/25) - Friday (12/26)
Happy Holidays!!

Temporary daytime closures will be in effect. Please allow for extra travel time and Drive Safely. Thank you for your continued patience!

6 months ago, Town of Windermere
Road Closures

Tonight’s the Night!

Join us for the LAST Food Truck Night of the year — and we’re ending it on a festive high note with our Holiday Movie Special! 🎄🍿

🕠 Time: 5:30 PM – 9:30 PM
🚚 Food Trucks serving up your favorites
🎬 Holiday movie vibes for the whole family

Come hungry, bring your blankets and chairs, and celebrate the season with great food, community fun, and a cozy movie night under the stars. Don’t miss this final Food Truck Night of the year!

SponsorsRenewal by Andersen, Wonderly Lights of Orlando, and Orlando Health Physician Associates

Musical Guest – Lucky To Be

Special Participation – Family Church and Windermere Library

Feature Movie: Home Alone (1990) - the movie starts at 7 PM!

6 months ago, Town of Windermere
food truck

ATTENTION
Please note that tonight’s WAY Committee meeting has been canceled.

6 months ago, Town of Windermere
way

Bessie St, East Blvd, 8th & 9th Aves. Construction - Week of Dec. 15th to Dec. 19th.

Crews will continue marking and visually locating underground utilities, removing some pine trees per plan, and taking delivery of some materials. Here’s what to expect from Monday (12/15) through Friday (12/19):

- Marking underground utilities, including hand digging to visually locate and determine the depth of various utilities.
- Remove row of pine trees along East Blvd near Bessie boat ramp.
- Taking delivery of some materials.

Temporary daytime road closures along East Blvd are possible this week. Please allow extra travel time and drive safely. Thank you for being so patient!

6 months ago, Town of Windermere
Road Closures

Butler St & 7th Ave Construction - Week of Dec. 15th – Dec. 19th.

Crews will install stormwater drainage at the intersection of Butler Street and 6th Avenue and pour curbs along Butler Street. Here’s what to expect from Monday (12/15) through Friday (12/19):

- Storm Drainage installation at the intersection of Butler Street and 6th Ave.
- Installation of curb on the East side of Butler Street.

This week, the Boat Ramp will be accessible from either 7th Ave or Butler, although 7th will be most dependable. There could be temporary closures on Butler Street.

Temporary daytime closures will be in effect. Please allow extra travel time and drive safely. Thank you for being so patient!

6 months ago, Town of Windermere
Road Closures