West 2nd Avenue Construction Week of Feb. 23 to Feb. 27
The information below is for West of Pine Street
Please be sure to allow for extra travel time!
Crews will be installing lime rock and curbs, repairing concrete and paver driveways, and removing old asphalt and installing lime rock for paving. Here’s what to expect from Monday (2/23) to Friday (2/27):

  • From 727 to 800 W. 2nd Ave, crews will be removing old asphalt and dirt and installing new lime rock for paving.

  • From 914 to 1141 W. 2nd Ave, crews will be installing lime rock base material for curbs and forming and pouring concrete curbs. Crews will work with residents to notify them 24 hours in advance when they will lose access to their driveways.

  • Tie-in paver and concrete driveways to the new curb where needed.

  • Crews will be grading lime rock.

Daytime closures will be in effect. Please drive carefully!
Thank you for your continued patience!

2 months ago, Town of Windermere
Traffic Alert

Bessie St, East Blvd, 8th & 9th Aves. Construction Week of Feb. 23 to Feb. 27

Crews will be installing storm drainage, grading roads, and installing new shell road material. Here’s what to expect from Monday (2/23) to Friday (2/27):

  • Installation of Storm Drainage on 8th Ave from Magnolia to East Blvd. and on Bessie between 8th Ave and 7th Ave.

  • Grading of roads and installation of new shell road material on 8th Avenue between Main Street and East Blvd; on East Blvd from 9th to 8th Avenues; and Oakdale Street between 8th and 10th Avenues.

8th Avenue between East Blvd and Bessie Street and Bessie Street between 7th and 8th Avenues will be closed this week!

Please allow extra travel time and drive safely! Thank you for your patience!

2 months ago, Town of Windermere
Traffic Alert

Butler St & 7th Ave Construction - Week of Feb. 23 to Feb. 27

This week, crews will be working along Butler and Forest Streets and in Fernwood Park. Here’s what to expect from Monday (2/23) to Friday (2/27):

-      A crew will continue work along Butler and Forest Streets as well as Fernwood Park, grading roads, working on swales, and laying sod.

There may be daytime lane closures on Butler Street between 6th and 7th Avenues and on 7th Ave between “Dirt” Main Street and Butler Street.

Please allow extra travel time and drive safely! Thank you for being so patient!

2 months ago, Town of Windermere
Road Closures

February Food Truck Night: Mark your calendars and bring your appetite! 🌮🍔🌯

Join us on Friday, February 27th, from 5:30 PM to 9:30 PM at Town Square Park for a night of great food, family fun, and music under the stars.
Enjoy a variety of delicious food trucks offering something for everyone — whether you’re craving sweet, savory, or somewhere in between.

✨ Special participation by the Windermere Library with crafts for the whole family and live music by Mauro Augustto!

Bring your friends, family, and lawn chairs, and come enjoy a wonderful evening in our beautiful Town!

We look forward to seeing you there!

2 months ago, Town of Windermere
FTN Feb. 2026

🎾 Tennis Courts Closure Notice 🎾

Please note that the Main Street Tennis Courts will be closed starting Monday, February 23, for resurfacing. The project is expected to take several days to complete.
The courts will not be available during this time. Please plan accordingly and avoid the area while work is underway.

Thank you for your patience as we make improvements to enhance your playing experience!

2 months ago, Town of Windermere
tennis

Commissioner Wilson – In-Person Office Hours!

Have a question, concern, or idea you’d like to share? This is your opportunity to connect directly during in-person office hours.

📅 Thursday, February 19

From 11:30 AM to 3:00 PM

@ PD/Community Conference Room

Reserve your time slot today:
📞 Call (407) 836-7312
📧 Email district@ocfl.net

Schedule your appointment and make your voice heard!

2 months ago, Town of Windermere
Wilson
Wishing a very happy birthday to our amazing Town Manager, Robert. On this special day we celebrate with him as he celebrates the BIG 5 OH!
2 months ago, Town of Windermere
Robert Birthday Post (1)

West 2nd Avenue Construction Week of Feb. 16 to 20.
The information below is for West of Pine Street
Please be sure to allow for extra travel time!
Crews will be installing lime rock and curbs, repairing concrete and paver driveways, and removing old asphalt and installing Lime rock for paving. Here’s what to expect from Monday (2/16) – Friday (2/20):

  • From 636 to 800 W. 2nd Ave, two crews will be removing old asphalt and dirt and installing new lime rock for paving.

  • From 914 to 1141 W. 2nd Ave, crews will be installing lime rock base material for curbs and forming and pouring concrete curbs. Crews will work with residents to notify them 24 hours in advance when they will lose access to their driveways.

  • Tie-in paver and concrete driveways to the new curb where needed. 

Daytime closures will be in effect. Please drive carefully! Thank you for your continued patience!

2 months ago, Town of Windermere
Road Closures

Butler St & 7th Ave Construction - Week of Feb. 16th – Feb. 20th.

This week, crews will grade Butler and Forest Streets and work in Fernwood Park. Here’s what to expect from Monday (2/16) to Friday (2/20):

  • A crew will continue work on Butler and Forest Streets, as well as at Fernwood Park, grading roads, working on swales, and laying sod.

There could be daytime closures on Butler Street between 6th and 7th Avenues and on 7th Ave between “Dirt” Main Street and Butler Street.

Please allow extra travel time and drive safely! Thank you for being so patient!

2 months ago, Town of Windermere
Road Closures

Bessie St, East Blvd, 8th & 9th Aves. Construction Week of Feb 16th – Feb 20th

Crews will be installing storm drainage, grading roads, and installing new shell road material. Here’s what to expect from Monday (2/16) to Friday (2/20):

  • Installation of Storm Drainage on 8th Ave from East Blvd. to Bessie Street and on Bessie between 8th Ave and 7th Ave.

  • Grading of roads and installation of new shell road material on 8th Avenue between Main Street and East Blvd; on East Blvd from 9th to 8th Avenues; and Oakdale Street between 8th and 10th Avenues 

8th Avenue between East Blvd and Bessie Street and Bessie Street between 7th and 8th Avenues will be closed this week.

There may be travel delays in this area, so PLEASE allow extra travel time and drive safely! Thank you for your patience!

2 months ago, Town of Windermere
Road Closures

February Food Truck Night: Mark your calendars and bring your appetite! 🌮🍔🌯

Join us on Friday, February 27th, from 5:30 PM to 9:30 PM at Town Square Park for a night of great food, family fun, and music under the stars.
Enjoy a variety of delicious food trucks offering something for everyone — whether you’re craving sweet, savory, or somewhere in between.

✨ Special participation by the Windermere Library with crafts for the whole family and live music by Mauro Augustto!

Bring your friends, family, and lawn chairs, and come enjoy a wonderful evening in our beautiful Town!

We look forward to seeing you there!

2 months ago, Town of Windermere
FTN Feb. 2026

Lakes Cleanup Day – Round 2
Sunday, April 19, 2026 | 1:30 – 3:30 PM

Help us keep Windermere’s lakes pristine!

After our first Lakes Cleanup Day on November 2, here’s your chance to join us for Round 2!

  • Meeting Location: Fernwood Park, 632 Butler Street

  • Time: 1:15 PM (to gather supplies and organize teams)

  • What to Bring: Closed-toed shoes; be prepared to walk through neighborhoods collecting trash to prevent litter from entering our lakes.

This is a great activity for the whole family—minors must be accompanied by an adult.

To register: Use the link or QR code on our website and social media.

For more information, contact Peter Balgobin.

#CleanLakes #LakesCleaupDay #Windermere #Stormwater #NPDES

3 months ago, Town of Windermere
stormwater

Bessie St, East Blvd, 8th & 9th Aves. Construction Week of Feb 9 to Feb 13

Crews will be installing storm drainage. Here’s what to expect from Monday (2/9) - Friday (2/13):

  • Installation of Storm Drainage on 8th Ave from East Blvd. to Bessie Street and on Bessie between 8th Ave and 7th Ave.

  • Grading of roads and installation of new shell road material on 8th Avenue between Main Street and East Blvd; on East Blvd from 9th to 8th Avenues; and Oakdale Street between 8th and 10th Avenues 

8th Avenue between East Blvd and Bessie Street and Bessie Street between 7th and 8th Avenues will be closed this week.

Please allow extra travel time and drive safely! Thank you for your patience!

3 months ago, Town of Windermere
Road Closures

West 2nd Avenue Construction Week of Feb. 9 to 13.
The information below is for West of Pine Street

Please be sure to allow for extra travel time!
Crews will be installing lime rock and curbs, repairing concrete and paver driveways, and removing old asphalt and installing Lime rock for paving. Here’s what to expect:

• Monday (2/9): Installation of curb on south side of street. 706 W 2nd Ave.

 • Monday (2/9) – Friday (2/13):

-    Two crews removing old asphalt and dirt and installing new lime rock for paving. From 535 to 636 W 2nd Ave and from 802 to 732 W 2nd Ave.

-    Tie-in paver and concrete driveways to new curb.

• Tuesday (2/10) – Friday (2/13):

-      Installation of lime rock Base material for ribbon curb in cul de sac.

-      Form and pour concrete ribbon curb in cul de sac.

-       Crews will work with residents to notify them 24 hours in advance when they will lose access to their driveway.

Daytime closures will be in effect. Please drive carefully! Thank you for your continued patience!

3 months ago, Town of Windermere
Road Closures

Butler St & 7th Ave Construction - Feb. 9 – Feb. 13th.

This week, crews will be grading Butler and Forest Streets and working in Fernwood Park. Here’s what to expect from Monday (2/9) - Friday (2/13):

  • A crew will continue work on Butler and Forest Streets as well as Fernwood Park, grading roads and working on swales.

There could be daytime closures on Butler Street between 6th and 7th Avenues and on 7th Ave between “Dirt” Main Street and Butler Street.

Please allow extra travel time and drive safely! Thank you for being so patient!

3 months ago, Town of Windermere
Road Closures

SHADE MEETING ATTORNEY-CLIENT SESSION NOTICE

There will be special meeting of the Windermere Town Council during which an attorney-client session will be held in accordance with Section 286.011(8), Florida Statutes, with Mayor Jim O’Brien, Council Members Mandy David, Tony Davit, Brandi Haines, Tom Stroup, and Andy Williams, Town Manager Robert Smith, and Outside Town Counsel Attorneys, Daniel T. O’Keefe, Bud Bennington, Glennys Ortega Rubin and Julissa Rodriguez of the Law Firm of Shutts and Bowen on Tuesday, February 10, 2026, at 5 PM or shortly thereafter, in the Town Hall located at 520 Main Street, Windermere, FL 34786.

The purpose of the attorney-client session is to allow the Outside Town Counsel Attorneys to confer with Town Council regarding strategy related to litigation on the pending appeal of the case of Town of Windermere v. Fanelli, Daniel et al., (Appellate Court Case #: 6D2025-2962).



ORLDOCS 23697728 1 20370.0002

3 months ago, Town of Windermere
Town Council

UPDATE!
Notice to Residents and Visitors: Tennis Courts Light Fixture Repairs

Please be advised that the Town will be conducting light fixture repairs on select tennis courts at the Windermere Recreation Center and Main Street locations on Monday, February 9, 2026.

During this work, large service vehicles and equipment will be present in and around the tennis court areas. We ask residents and visitors to be mindful of crews and vehicles.

Access to certain courts or surrounding areas may be temporarily limited for safety.

Thank you for your patience and cooperation while this maintenance is underway.

3 months ago, Town of Windermere
tennis

West 2nd Avenue Garbage Pick Up!
The information below is for West of Pine Street

Beginning tomorrow, Friday, Feb 6th, and continuing for the next 2 weeks until, and including Friday Feb 20th, garbage collection will be as follows:

• Waste Pro will be using a small truck(s) and a different crew to pick up on Tuesdays and Fridays only.
• Tuesday and Friday will be the only pickup days.
• They will pick up every type of trash on Tuesdays and Fridays, including Garbage, Yard Waste and Recycling.
• They will begin pick up at 6:30 am on Tuesday and Friday, so have your garbage out before 6:30 am or the night before.
• This will be a separate crew, and you will need to have your Garbage, Yard Waste and Recycling curbside for pickup.

Please allow extra travel time and drive safely!!
Thank you for your continued patience!


3 months ago, Town of Windermere
Garbage Collection

Postponed: Lakes Cleanup Day Round 2!

Our first Lakes Cleanup Day on November 2nd was a great success, and we were excited to host a second cleanup on February 8th.

Unfortunately, the February 8th event had to be postponed due to inclement weather and low registration.

We are currently working on selecting a new date and will share updated event details soon. We hope you’ll be able to join us when the cleanup is rescheduled for a warmer, more suitable day.

 Thank you for your continued support and commitment to helping keep Windermere’s lakes clean and beautiful!

 For more information about the Lakes Cleanup program, please visit: https://www.town.windermere.fl.us/o/tow/page/stormwater

Questions, please get in touch with Peter Balgobin: PBalgobin@Town.Windermere.FL.US

WAIVER HERE!

#CleanLakes #LakesCleaupDay #Windermere #Stormwater #NPDES

3 months ago, Town of Windermere
stormwater

Ward Trail Pedestrian Bridge – Construction Update (Feb 2–Feb 14)

Project: Ward Trail Pedestrian Bridge (Safe Routes to School)
Contractor: Gosalia Concrete Constructors
Location: Ward Trail / Lake Butler Blvd area

What to Expect from Feb. 2 to Feb 14:

Construction activities for the Ward Trail Pedestrian Bridge project will begin Monday, February 2, 2026, with early-phase work focused on mobilization, site preparation, and initial clearing. During this period, residents may notice:

Feb 2–6:
• Contractor mobilization and setup in designated work areas
• Placement of construction equipment and materials
• Temporary maintenance of traffic (MOT) measures in Areas 1 & 2

Feb 3–14:
• Erosion control installation
• Clearing and grubbing within approved construction limits
• Early site preparation activities in Areas 1 & 2

Access & Impacts:
• No bridge removal or installation during this period
• Temporary localized trail impacts possible
• Work during normal daytime construction hours

Why This Work Matters:
These activities prepare the site safely and support long-term pedestrian connectivity and student safety.

Thank you for being so patient as this important project begins.